Shrub Oak Engineering Consultants

All Phases of Residential & Light Commercial Construction

Home

Analysis

Evaluation

What Can WE Do For YOU!

Contact Us!

Portfolio

The Design Process

Client Consult

Schematic Design

Design Development

Construction Documents

Septic System Evaluation

Septic System Design

Site Plans

Clerk of the Works

Professionals

Principals

 

Production of Construction Documents:


  • Complete Final Design Drawings (e.g. "Construction Set") –
    • Produce Five (5) sets all signed & sealed (typically 10 sheets per set – 24x36 inches)
  • Produce Specifications (part of the "Construction Set") -- Five (5) sets, of which 2 are signed & sealed
    • General Contarctor obligations
    • Details of Construction Methods & Requirements
    • Details of Materials - Type & Quality
  • Provide Engineering Calculations for Bldg Departtment Review (if required) – Two (2) sets
  • Provide Cost Estimate / Materials Take Offs  (on plans)
  • Submit Documentation to Building Department for approval -- file Building Permit Application & pay filing fees
  • Secure Design approval (Building Permit Issued) and/or Care for Building Department revisions (if any)
  • Provide Contractor References – if requested
  • Evaluate Contractors & Bids --if requested

Back to Main Design Process Page 

Next Design Process Page

Back to Home Page

Copyright - Shrub Oak Engineering Consultants - 2008

Web Hosting powered by Network Solutions®